At the end of 2021, the total floor area of energy-renovated buildings in the public sector amounted to 1.92 million m2, and a year later to 2.15 million m2. Within OP EKP 906,400 m2 of total floor area were renovated by the end of 2022. According to the first estimates, the energy-renovated floor area at the end of 2023 will be at the level of the OP EKP target value, while the target from OP EKP for the energy renovation of buildings owned and occupied by the central government will not be achieved. Under the obligation from Article 5 of the EED from 2012, 66,022 m2 of floor area were renovated by the end of 2021, and 68,617 m2 by the end of 2022, or only 27% of the 2014–2022 target. In the period 2014-2022, the annual renovation target was achieved only in 2018, while the cumulative target was never achieved.
Jožef Stefan Institute - Energy Efficiency Centre
Target values of the indicator [1.000 m2] | Expected value of the indicator in 2022 and 2023 [1.000 m2] | Indicator values in the period 2011–2021 [1.000 m2] | |
---|---|---|---|
2011 | 0 | ||
2012 | 63.27 | 58.83 | |
2013 | 301.04 | 513.29 | |
2014 | 538.82 | 952.67 | |
2015 | 776.59 | 1241.73 | |
2016 | 980.28 | 1241.73 | |
2017 | 1183.97 | 1243.83 | |
2018 | 1387.66 | 1471.77 | |
2019 | 1591.35 | 1673.60 | |
2020 | 1795.04 | 1803.44 | |
2021 | 1919.08 | 1919.08 | |
2022 | 2148.13 | ||
2023 | 2337.43 |
The indicator methodology is available only in Slovene (link to the indicator)