At the end of 2018, the total floor area of energy-renovated buildings in the public sector amounted to 1.51 million m2, which exceeds the indicative annual target by 9%. In 2018, more than 250,000 m2 were renovated, which is significantly more than in 2017, but still lags behind the values of annually renovated floor area in the period 2013−2015. In order to achieve the 2020 target, a floor area of just under 140,000 m2 will need to be renovated annually in the period 2019−2020. Together with this indicator, it is also necessary to consider the results of indicators for monitoring the CO2 emissions reduction and final energy savings achieved through the implementation of measures in the public sector.
Target values of the indicator | Expected value of the indicator in 2019 and 2020 | Indicator values in the period 2011−2018 | |
---|---|---|---|
2011 | 0 | ||
2012 | 63.27 | 63.27 | |
2013 | 301.04 | 522.62 | |
2014 | 538.82 | 972.66 | |
2015 | 776.59 | 1261.72 | |
2016 | 980.28 | 1261.72 | |
2017 | 1183.97 | 1265.05 | |
2018 | 1387.66 | 1515.15 | 1515.15 |
2019 | 1591.35 | 1661.30 | |
2020 | 1795.04 | 1986.01 |
The indicator methodology is available only in Slovene (link to the indicator)
Barbara Petelin Visočnik, JSI-EEC, prepared as part of project LIFE ClimatePath2050 (https://www.podnebnapot2050.si/)