Figure PO36-1: Energy savings achieved by the energy efficiency obligation scheme (EEOS) and the alternative policy measure, preliminary data, Slovenia, 2014‒2024
Show data
|
Energy efficiency obligation scheme[GWh] |
Eco Fund programs[GWh] |
Together[GWh] |
Annual target values up to 2020[GWh] |
Annual target values after 2020[GWh] |
| 2014 |
66.25 |
149.44 |
215.68 |
349 |
|
| 2015 |
362.51 |
122.79 |
485.30 |
349 |
|
| 2016 |
277.59 |
140.24 |
417.83 |
436 |
|
| 2017 |
251.65 |
155.91 |
407.56 |
436 |
|
| 2018 |
281.89 |
208.55 |
490.44 |
523 |
|
| 2019 |
282.92 |
295.64 |
578.56 |
523 |
|
| 2020 |
295.47 |
338.90 |
634.36 |
523 |
|
| 2021 |
261.81 |
348.54 |
610.36 |
|
458.39 |
| 2022 |
312.01 |
388.74 |
700.76 |
|
458.39 |
| 2023 |
932.60 |
512.17 |
1444.76 |
|
458.39 |
| 2024 |
488.38 |
540.05 |
1028.43 |
|
744.89 |
| 2025 |
|
|
|
|
744.89 |
| 2026 |
|
|
|
|
859.49 |
| 2027 |
|
|
|
|
859.49 |
| 2028 |
|
|
|
|
1088.69 |
| 2029 |
|
|
|
|
1088.69 |
| 2030 |
|
|
|
|
1088.69 |
Figure PO36-2: Structure of achieved energy savings by individual measures implemented within the energy efficiency obligation scheme (EEOS), without energy savings from the construction of a large gas-steam unit in a district heating plant, preliminary data Slovenia, 2024
Show data
|
Adding additives to the motor fuels[GWh] |
Other measures defined on the basis of the energy audit[GWh] |
Combined heat and power systems [GWh] |
Self-supply of electricity[GWh] |
High efficiency gas boilers[GWh] |
Measures in district heating systems[GWh] |
Energy-efficient lighting in buildings[GWh] |
Wood-fuelled biomass boilers and solar thermal collectors[GWh] |
Energy renovation of buildings[GWh] |
Energy-efficient electric motors[GWh] |
Other measures for reduction of electricity consumption[GWh] |
Heat pumps for central heating[GWh] |
Other measures in transport[GWh] |
Other measures[GWh] |
| 2024 |
44.66 |
25.74 |
17.69 |
16.41 |
6.66 |
3.68 |
3.32 |
2.98 |
2.09 |
1.83 |
1.72 |
1.66 |
1.50 |
1.13 |